Products

How does μCaler MRD Solution achieve 3-day fast delivery ?

View: 5086 / Time: 2022-11-03
Relying on the precise control of the whole process of own synthesis factory, A: Relying on the precise control of the whole process of its own nucleic acid synthesis factory.Start the high-throughput automatic synthesis of Probe from the first day of receiving the MRD order, and complete the modification synthesis, aminolysis, elution quantification, quality control (if the quality control standard is not met, the coincidence will be started simultaneously), and sub-packaging on the second day. and so on; on the third day, the overlapping and sub-packaging, draining, sub-packaging, Panel production and product packaging and delivery, etc. will be completed in sequence; ensure product can be delivery within 3 working days.